Albany UltraTough M&I Manuel de service

Naviguer en ligne ou télécharger Manuel de service pour Ouvreur de porte de garage Albany UltraTough M&I. Albany UltraTough M&I Technical data Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 34
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
UltraTough M&I OWNERS MANUAL
Doors are UltraRugged, UltraReliable, UltraAffordable.
P/N:001449
Rev: 4/22/2010
Version 4.2
Albany Door Systems - A Company of Albany International Corp. All Rights Reserved
1080 Maritime Drive, Port Washington, WI 53074 - 975-A Old Norcross Road, Lawrenceville, Georgia 30046
262-268-9885 www.albanydoors.com
Vue de la page 0
1 2 3 4 5 6 ... 33 34

Résumé du contenu

Page 1 - Version 4.2

UltraTough M&I OWNERS MANUAL Doors are UltraRugged, UltraReliable, UltraAffordable. P/N:001449 Rev: 4/22/2010 Version 4.2 Alba

Page 2 - STATEMENT OF WARRANTY

9 Manual #001449 Version 4.2 Activation - Repair - Replacement

Page 3 - TABLE OF CONTENTS

Rev. 4/9/2010 Manual #001449 10 High Speed Doors Operation

Page 4 - INTRODUCTION

11 Manual #001449 Version 4.2

Page 5 - Product description

Rev. 4/9/2010 Manual #001449 12 High Speed Doors Operation

Page 6 - Safety advice

13 Manual #001449 Version 4.2 The picture shows all the parts that are included in the dampening plate repair kit. Situation B described in the pr

Page 7

Rev. 4/9/2010 Manual #001449 14 High Speed Doors Operation Troubleshooting How to Wedge a Curtain Why would a curtain need a wedge? A wedge is u

Page 8 - Service & Repair

15 Manual #001449 Version 4.2 Removal and Re-installation of curtain in guides 1. Unbolt the hinged front guide plates of both the left and right

Page 9

Rev. 4/9/2010 Manual #001449 16 High Speed Doors Operation

Page 10

17 Manual #001449 Version 4.2 Maintenance Schedule Due to the unique design features of your new "RE-COIL-AWAY", the need for continual

Page 11 - Operation

Rev. 4/9/2010 Manual #001449 18 High Speed Doors Operation Gearbox The gear construction is maintenance-free and has lifetime lubrication. (The ou

Page 12

1 Manual #001449 Version 4.2 UltraTough M&I, UltraBig M&I, PosiDrive M&I High Speed Doors EXCLUSIVE LIFETIME SBR FABRIC WARRANTY Albany

Page 13

19 Manual #001449 Version 4.2 M&I Re-Coil-Away Architectural Over 12’ x 12’ (Balanced)

Page 14

Rev. 4/9/2010 Manual #001449 20 High Speed Doors Operation M&I Re-Coil-Away Architectural Up To 12’ x 12’ (Balanced)

Page 15 - Troubleshooting

21 Manual #001449 Version 4.2 M&I Re-Coil-Away Architectural Over 12’ x 12’ (Unbalanced)

Page 16

Rev. 4/9/2010 Manual #001449 22 High Speed Doors Operation M&I Re-Coil-Away Architectural Up to 12’ x 12’ (Unbalanced)

Page 17

23 Manual #001449 Version 4.2 M&I Re-Coil-Away XL Architectural Over 24’ x 27’

Page 18 - Maintenance Schedule

Rev. 4/9/2010 Manual #001449 24 High Speed Doors Operation Albany Re-Coil-Away Door Mechanical Procedures TRAVELLING WINDBAR ASSEMBLY This is an

Page 19 - Torque Specifications

25 Manual #001449 Version 4.2 STEP 1 Note: If your door was supplied from the factory with a Traveling Windbar, proceed directly to S

Page 20

Rev. 4/9/2010 Manual #001449 26 High Speed Doors Operation TRAVELLING WINDBAR ASSEMBLY – WINDBAR TRACK (Jamb-Mount) STEP 2 – ALL JAMB-MOUNTED WIND

Page 21

27 Manual #001449 Version 4.2

Page 22

Rev. 4/9/2010 Manual #001449 28 High Speed Doors Operation

Page 23

Rev. 4/9/2010 Manual #001449 2 High Speed Doors Operation TABLE OF CONTENTS ALBANY DOOR SYSTEMS CONTACT INFORMATION Port Washington, WI 1080 Mari

Page 24

29 Manual #001449 Version 4.2 TRAVELLING WINDBAR ASSEMBLY – WINDBAR TUBE IN-STALLATION STEP 3 - FOR 4” OR 4-1/2” DIAMETER WINDBARS Determine dimens

Page 25

Rev. 4/9/2010 Manual #001449 30 High Speed Doors Operation TRAVELLING WINDBAR ASSEMBLY WINDBAR TUBE INSTALLATION STEP 4 (FOR 6-5/8” OR 8-5/8” DIAM

Page 26 - STEP 2

31 Manual #001449 Version 4.2 TRAVELLING WINDBAR ASSEMBLY WINDBAR TUBE INSTALLATION STEP 4 (FOR 4” OR 4-1/2” WINDBARS) With the door in the close

Page 27 - (Jamb-Mount)

Rev. 4/9/2010 Manual #001449 32 High Speed Doors Operation Periodic Maintenance Albany Door Systems high speed doors are engineered for low mainten

Page 28

Albany Door Systems - A Company of Albany International Corp. All Rights Reserved 1080 Maritime Drive, Port Washington, WI 53074 - 975-A Old Norcross

Page 29

3 Manual #001449 Version 4.2 INTRODUCTION The contents of this manual are designed to help you operate and maintain Albany UltraTough™ high speed d

Page 30 - STALLATION

Rev. 4/9/2010 Manual #001449 4 High Speed Doors Operation Product description Function and design of this door The model Re-Coil-Away is a vertica

Page 31 - WINDBAR TUBE INSTALLATION

5 Manual #001449 Version 4.2 Technical Data Door principle: Roll door Running direction: Vertical Application: External door (also applicable a

Page 32

Rev. 4/9/2010 Manual #001449 6 High Speed Doors Operation Responsibilities of the operator The Albany Re-Coil-Away door is designed and manufacture

Page 33 - Periodic Maintenance

7 Manual #001449 Version 4.2 Service & Repair Customer Service In case of door maintenance/malfunctions or repair work, please contact the sup

Page 34

Rev. 4/9/2010 Manual #001449 8 High Speed Doors Operation Inertia Brake GFA FG220-15-60 Lock-Out Tag-out all electrical power supplied to the door

Commentaires sur ces manuels

Pas de commentaire